






Desertcart purchases this item on your behalf and handles shipping, customs, and support to Belgium.
Specification: Material: Durable nylon + metal hook Available in Three Size:10m(33 foot), 15m(50 foot), 20m(65 foot) Width:2.5cm Color:Black; Blue Package Included: 1 * Long Dog Training Lead Features: 1.From now you can walk your pet whether it's rainy or snowy. The leash is none the worse for it. Being made of durable nylon, this accessory is not only tear, wear and water-resistant, it 's also super strong. Fully reliable for tracking, patrolling work or walking, this nylon dog lead deserves your attention. The gear is super long giving your pet enough freedom when walking. 2.Perfect for training, tracking and walking nylon dog leash will quickly become your favourite one and replace all the others in your pet's collection. Appreciate its light weight, super wear-resistance and incredible practicability - everything is due to nylon material. Only nylon dog gear can be worn at any weather and it won't be spoiled. Nylon dog leash doesn't even stretch or deform because we use only premium quality stuff. 3.Hardware fully corresponds the declared quality of the item. The leash is equipped with metal hook, which will never rust or tarnish. It is strong, sturdy and long-lasting. The hook is double stitched as all the item to achieve additional reliability. As for cleaning the gear, you can wash it when needed. Cleaning and washing are not a problem because nylon dries out quickly and stands water contact perfectly. Our Service: Ploopy focus on provide high quality products for your lovely pet. Hope that our products can bring your pet a healthy and happy life. please e-mail us, if you have any problem or suggestions with our products, we will serve you wholeheartedly.
Trustpilot
3 weeks ago
2 weeks ago